Class I2 was a mature design, but the ventilation in the rear unit struggled when the motors were working hard; the 1995 order for 10 more were delivered with better ventilation in the rear unit, plus a multi-system drivetrain instead of the DC-only drivetrains in the earlier I’s.
10 were built, all are in service.